Good construction practice recommends an integral foundation ledge a minimum of 3 inches below the level of the floor slab. A foundation ledge provides a positive water barrier at the floor level.
Good construction practice recommends an integral foundation ledge a minimum of 3 inches below the level of the floor slab. A foundation ledge provides a positive water barrier at the floor level.