Foundation Ledge
Good construction practice recommends an integral foundation ledge a minimum of 3 inches below the level of the floor slab. A foundation ledge provides a positive water barrier at the floor level.
Good construction practice recommends an integral foundation ledge a minimum of 3 inches below the level of the floor slab. A foundation ledge provides a positive water barrier at the floor level.
“Joining the MCAA will pay off instantly as all their tools will be available to you.”
Paul Cantarella
Cantarella & Son, Inc.
MCAA member since 2013