Amerimix
Cultured Stone
EZ Scaffold Corp.
EZG Manufacturing
Federated Insurance
Fraco USA, Inc.
Hydro Mobile, Inc.
Kennison Forest Products, Inc.
Keson/SOLA
Mortar Net Solutions
Non-Stop Scaffolding
Norton Clipper
PROSOCO, Inc.
Southwest Scaffolding
SPEC MIX LLC
The Belden Brick Company
Trimble
Xtreme Manufacturing

Creating, Managing & Utilizing a Construction Schedule

Provider: Informa
Discipline: Ethics & Business Practices
Credits: 3.00

A construction schedule is critical to a project’s success in terms of time, money, quality and safety. In this interactive session, attendees will be able to develop a Critical Path Method (CPM) construction schedule and understand how to create an activities list and generating a network diagram. Analysis phase begins upon schedule completion, including: comprehending the intermingling of trades, determining who owns float, resource allocation, potential litigation, and how the schedule can affect both quality and safety. Correlation between the CPM and the Gantt chart will also be examined, demonstrating how to turn a CPM flowchart into actual calendar/workdays. Communication and documentation of construction schedules from both the general contractor and the subcontractor point of view will also be reviewed. A brief introduction to Building Information Modeling (BIM) and its effect on scheduling will be explored.



1. Outline a Critical Path Method (CPM) schedule from start to finish and define CPM uses beyond scheduling

2. Analyze a CPM and how it correlates to a Gantt Chart

3. Integrate effective communication between the general contractor and the subcontractor

4. Identify how a schedule affects quality and safety

For more information please visit www.worldofconcrete.com or contact Informa at 972-536-6416.

Future Dates and Locations

Link Date Time Location Speaker Cost
No courses scheduled

“We are a passionate group that can solve challenges through our dedication.”

Brian Grant
Grant Contracting Co., Inc.
MCAA member since 1996

Learn More