Oregon State’s Cordley Hall Rehab Includes Extensive Brick Repairs

Oregon State University has completed a multiyear rehabilitation of Cordley Hall, converting a 23,039-square-meter (248,000-square-foot) science building into an updated research and teaching facility while retaining the existing structure.

Cordley Hall was built in two phases, in 1954 and 1967. By 2017, the building faced mounting infrastructure issues. Its exterior envelope, along with mechanical, electrical, and plumbing systems, no longer met the needs of modern labs and classrooms. Recurring failures also threatened research operations.

Instead of demolishing the building, OSU chose a phased renovation. The approach preserved embodied resources and maintained the building’s historic campus character while allowing the project team to upgrade major components over time. Hennebery Eddy provided architecture and interiors, and Andersen Construction Company served as general contractor.

On the exterior, the work included extensive brick repairs and full window replacement. A new entrance canopy now anchors the building’s presence and reconnects it to Campus Way, a major pedestrian corridor.

Inside, the renovation reshaped teaching and research labs, classrooms, offices, and the lecture hall. The team added common spaces across all floors, including meeting rooms, study areas, and lounges. The design also emphasized visibility and collaboration by increasing transparency between labs, classrooms, and circulation areas. Hallway exhibits and public-facing displays incorporate parts of OSU’s natural history collections, including arthropod and herbarium resources.

For mason contractors, projects that pair brick repair scopes with full window replacement put details under a bright light at every opening. Sequencing also drives results on campus jobs, where access, staging, and pedestrian routes affect daily production.

Read the full, original article from The Construction Specifier here.

About: The Daily Digest
The Science of a Straight Line: Why Masonry’s Smallest Decisions Make the Biggest Differences
September 2026

There is a unique phenomenon in construction: the human eye can spot an out-of-plumb wall from 50 yards away across a crowded job site. We might not always be able to explain the exact mathematical deviation without a laser level, but our brains instantly

The Utah Masonry Council's Masonry Education Day
September 2026

The 2026 Masonry Education Day at Interstate Brick in West Jordan is bringing together members of Utah’s architecture, engineering, and construction community for a day focused on education, technical understanding, and workforce development. The event r

MCAA Upstate New York: Regaining Market Share Through Education
September 2026

The Upstate New York chapter of the MCAA was established in 2014 by a dedicated group of both union and non-union masonry contractors, producers, and suppliers who shared concerns about the declining use of masonry. T

GEN NXT: Luis Sontay
September 2026

For this month, the MCAA got to sit down with aspiring mason Luis Sontay. From taking an interest in masonry as a kid to placing 1st in a postsecondary competition, Luis’ dedication and passion for the trade is clear. Luis describes his early passion fo