Archtec system wins Historic Bridge and Infrastructure Award

Words: Paula Almazan/Public/News/20120714080000-1.jpg" width="600" height="338" border="0" alt="ont Telpyn Bridge" />
ont Telpyn Bridge
CINTEC America is a world leader in the field of structural masonry retrofit strengthening, repair, and preservation. Their Archtec bridge reinforcement system recently won The Historic Bridge & Infrastructure Award for their work on the Pont Telpyn Bridge over the Clywd River in the United Kingdom. In 2008 the bridge suffered from severe flood damage and was prevented from total collapse by CINTEC anchors. Archtec is a complete diagnostic design and installation service that utilizes sophisticated technology and drilling methods specially designed to strengthen masonry arch bridges while maintaining the historical integrity of the bridge.

The damage to the bridge resulted in evidence of movement, severe cracking, and dilatancy of the masonry. There was proof of cracking through mortar joints throughout the length of the wall. The road surface showed three main failures that indicated tension failure above the east abutment, compression failure above the west springing, and shears failure to the west of the bridge. In order to repair the bridge a temporary channel was excavated to divert the river throughout the repair phase. Next, the arch was propped underneath and the parapet walls were removed so that CINTEC anchors could be drilled and installed to stabilize the structure. After the installation of the CINTEC anchors to bring the bridge back to a 44 ton capacity, the roadway was reconstructed to the original profile. In addition to preserving the historical features of the bridge, Archtec has no impact on the natural environment, is economically superior to other methods of reinforcement, and can be completed with little or no traffic delays.

The Historic Bridge & Infrastructure Awards were created for the purpose of recognizing and encouraging innovation in conservation. The awards are given to a project that involves the structural maintenance, strengthening, restoration, and conservation of a structure that is 30 years old or more, within the United Kingdom.

CINTEC’s Archtec system has also been previously awarded the 2002 Queen’s Award for Enterprise in Innovation and received two U.K. Historic Bridge Awards and an Engineering Excellence Award from The Institution of Engineers, Australia in 2001.
Turning Visualization into Opportunity: How Digital Design Tools Are Supporting Today’s Masonry Contractors
April 2026

Today’s homeowners are taking a proactive approach to planning and design. Before reaching out to a contractor, many clients spend hours researching products, comparing materials, and building inspiration boards online. By the time they request a quote,

Smarter Time Tracking on the Jobsite: Introducing Geofence Notifications and Logging in CrewTracks
April 2026

For masonry contractors, time tracking is more than just a payroll task; it’s a key part of managing crews, understanding job costs, and keeping projects running smoothly. Yet many companies still struggle with one common challenge: making sure employees

Outreach Outlook: Building Momentum Across the Southern Region
April 2026

As April arrives, the pace of our outreach and workforce efforts across the Southern Region reaches a new level of intensity. This is the time of year when our programs, partners, and state collaborators all accelerate at once. SkillsUSA competitions are

Marvelous Masonry: Elbphilharmonie
April 2026

Most people know the Elbphilharmonie for its glass façade and dramatic roofline. From a distance, that’s what defines the skyline in Hamburg’s HafenCity district. But for masonry contractors and suppliers, the real story starts at the base.