Spider offers access for chimney stack maintenance

Words: Heidi AndersSpider, a division of SafeWorks, recently offered a custom, suspended scaffolding solution for tuck-pointing and brick repair work on the 125-foot-tall chimney stack at Lane Tech High School in Chicago.

IWG Inc. was familiar with Spider’s specialization in suspended applications. The company turned to Spider for a custom solution. Spider designed, built and installed a rigging star equipped with three swing stages and two Beta Max Gemini material hoists. The rigging star was lifted into place by a crane and then counterweighted, eliminating the need for anchoring into the structure.

Additionally, Spider offered all rigging services as well as on-site user training to ensure the safe operation of the equipment.

“We were genuinely impressed with Spider’s capabilities through every phase of this project, from the initial design to the on-site supervision,” says Al Arreguin, owner and operator with IWG Inc. “Their Chicago team did a fantastic job meeting our challenges while keeping us safe, on schedule, and within our budget.”
Is Contact with Wet Mortar or Grout Dangerous?
April 2026

In the world of masonry, few materials are as common as mortar and grout. Whether you are laying brick, concrete masonry units (CMU), or pouring grout into masonry walls, wet cement and mortar are constant companions. However, beneath their utility lies a

The Importance of Instructor Support
April 2026

Whether you are a new or veteran masonry instructor, we all need support throughout our careers. We can never stop learning, and keeping up with ever-changing technology, materials, and installation techniques can be overwhelming alongside the everyday pr

Vibing Masonry #11: Innovative Concrete Masonry Technologies in Healthcare Design
April 2026

In the high-stakes environment of healthcare design, every material choice is a clinical decision. Architects, engineers, and facility administrators are tasked with creating spaces that are not only resilient and code-compliant but also conducive to heal

Why Termination Bars Still Matter: A Practical Look at Long‑Term Flashing Performance
April 2026

In recent discussions across the masonry industry, I have heard termination bars described as “old school.” The implication is that with modern materials, primerless peel-and-stick flashings, advanced sealants, and structural insulated sheathing, mechanic