Spider provides expert suspended scaffolding solution for Colorado State Bank Building

Words: Heidi AndersSpider, a division of SafeWorks, LLC, provides the suspended access solution, including swing stages, fall protection and training, for installation of panels on the façade of the 400-ft tall Colorado State Bank Building in downtown Denver, CO.

Under the direction of general contractor Swinerton Builders, Spider supplied subcontractor GEN3 with nine u-shaped swing stages powered by Zmac/1000® traction hoists to access the columns of the structure. In addition, seven standard modular platforms ranging in length from 15 ft to 45 ft and also powered by the workhorse Zmac/1000®s are increasing efficiency by feeding materials to the u- shaped stages. Safety line, rope grabs and termination plates from Spider’s trusted line of fall protection solutions are also in place throughout the project.

Spider provided Competent Person Training for all of the equipment operators from GEN3 and Swinerton Builders and is making regular site visits to ensure safety compliance.

“Spider’s cooperation and knowledge is second to none, and as the superintendent for the 27-story re- clad of the Colorado State Bank building, that makes them first in line when it’s time for staging and safety,” says Doug Schnorr, Senior Superintendent for Swinerton Builders.

Spider was the only local swing stage company that could provide the high volume of rental equipment for the project’s 7-month duration along with the training support and expertise. Since the work began in April, there have been no incidents or injuries, and the goal is for that trend to continue until the project’s October completion.
The Mountain Modern Home: Blending Rugged Beauty with Contemporary Design
October 2026

Tucked among trees and surrounded by a naturally serene landscape, The Mountain Modern home makes an immediate impression, one of quiet confidence, balance, and belonging. From the moment you arrive, the home feels anchored to its environment. Expansive i

GEORGE 3 Is Here: From Test Drive To Jobsite
October 2026

GEORGE 3.0 Beta brings a simpler home screen, easier mode selection, and practical tools shaped by feedback from the masonry industry.

Bon Tool Remains a Silver Partner in 2027
October 2026

The Mason Contractors Association of America (MCAA) is pleased to announce that Bon Tool will remain as a Silver Partner in the 2027 Masonry Alliance Program.

Tradesmen's Software Continues as a Gold Partner in 2027
October 2026

The Mason Contractors Association of America (MCAA) is delighted to share that Tradesmen's Software will continue as a Gold Partner in the 2027 Masonry Alliance Program.