Rebar: Rebar Positioners

This cutaway view shows 2 vertical bars being held in place by a galvanized wire rebar positioner placed in the mortar joint. The bar positioner helps keeps the rebar from moving during grouting.
This cutaway view shows 2 vertical bars being held in place by a galvanized wire rebar positioner placed in the mortar joint. The bar positioner helps keeps the rebar from moving during grouting.
Rebar positioners are used to keep masonry wall reinforcement in the correct location. They come in many configurations, materials, shapes and sizes. Some project specifications require bar positioners and others don’t. They take time and money to install. Should you be using bar positioners?

Proper bar placement is critical for meeting the structural design. Misaligned bars reduce capacity of walls to resist lateral wind and seismic loads. Rebar placement tolerances for most designs are ±½” within the width of the wall and ±2” down the length of the wall (See TMS 602 Section 3.4 B.11.).

The 2013 Specification for Masonry Structures (TMS 602-13/ACI 530.1-13/ASCE 6-13) does not specifically mention bar positioners but does require reinforcement be placed in the grout space prior to grouting (see Section 3.2 E, that means no stabbing bars into freshly grouted masonry). The mason contractor must keep bars in place during grouting as required by TMS 602 Section 3.4 B.1: “Support reinforcement to prevent displacement caused by construction loads or by placement of grout or mortar, beyond the allowable tolerances.”

Older building codes were more explicit. The 1997 Uniform Building Code, for example, required “reinforcement shall be secured against displacement prior to grouting by wire positioners or other suitable devices at intervals not exceeding 200 bar diameters” (Section 2104.5). Some designers still have this concept in their specifications, and others may limit bar positioner placement to a maximum spacing of 10 feet.

When low-lift grouting techniques are used, you can see the bar extending above the grout pour at the top of the wall, and if that bar extension is vertical the probability of the rebar being displaced at the bottom of the lift is unlikely. With high-lift grouting, cleanouts at the base of the wall facilitate bar placement and inspection and most contractors will tie the vertical bar to foundation dowels to hold it in place. At the top of the wall vertical bars can be tied to bond beam steel but this is a bit risky – sometimes the bond beam bar moves during grouting, displacing all the vertical bars down the line.

The bottom line: you are required to build masonry walls with reinforcement located precisely as required by the structural design. Some contractors recognize how critical it is to have rebar in the correct place and will use bar positioners, others will not. Recognize that there is some risk to not using bar positioners – if rebar moves around during the grouting process you may fail the structural inspection, leading to costly delays and corrective action. Our advice to designers is to not specifically require bar positioners in project specifications, requiring instead that masonry reinforcement be placed according to TMS 602 Section 3.4. Leave it up to the mason contractor and their “means and methods” to ensure reinforcement is in the correct location as the wall is built.
About: Technical Talks
Managing the Mysterious Job Site Slowdown
August 2026

Every contractor knows the feeling. A job looks good on paper. The schedule makes sense. The crews are lined up. The material is supposed to be there. Then, for no obvious reason, the whole job starts crawling. That is what makes it so frustrating. Nobod

Sainte-Cécile Cathedral
August 2026

Imagine being handed a set of plans calling for the largest brick cathedral in the world. Now imagine building it without modern cranes, engineered scaffolding, forklifts, power tools, or structural analysis software. That was the challenge facing medie

Why SkillsUSA is the Keystone to MCAA’s Outreach
August 2026

When I stepped into the role of the MCAA’s first Director of Youth Outreach and Education, I knew we had a massive job ahead of us. I am a fourth-generation brick mason, and I have spent over two decades teaching the trade, from working with apprentices a

The First Paycheck
August 2026

Several years ago, Huntley Brothers hired a young apprentice. It was his first real job, and he had never had a paycheck before. Friday rolled around, and he got paid just like everyone else. Later that day, one of the guys told me something I have never