Vaishya Tekri Dig Renews Focus On Ancient Brick Stupa Construction Near Ujjain

Nearly 90 years after the first excavation at Vaishya Tekri near Ujjain, Madhya Pradesh is preparing to reopen one of its biggest unanswered archaeology stories: what, exactly, sits inside a mound long tied to a Mauryan-period Buddhist stupa and traditions connected with Emperor Ashoka.

Records from the 1938-39 excavation put the main mound at roughly 350 feet in diameter and at least 100 feet high. That is far larger than the Great Stupa at Sanchi, which stands at about 120 feet in diameter and 54 feet high. Archaeologists stress that these numbers describe the mound measured decades ago, not a fully verified monument. A fresh excavation is required to confirm the structure’s actual plan, size, and construction phases.

For mason contractors, the most interesting details sit in the old construction notes. Archaeologists reported a core formed largely from tightly rammed local earth, with large bricks used on the exterior. They also documented unusual masonry at the base that was meant to resist the outward pressure created by such a huge mass. The earlier work also identified evidence of a principal stupa and two smaller stupas.

The 1938-39 dig ended without a complete architectural picture after a gas-related incident left laborers unconscious, and the site then stayed largely untouched for decades. That history is a reminder for today’s crews working around deep excavations and historic fabric: plan for air quality monitoring, ventilation, and clear stop-work triggers, especially when reopening old trenches or entering low, enclosed areas.

Officials have also flagged practical hurdles before large-scale work starts, including excavation methodology, conservation planning, site protection, and land issues because some of the area is privately owned. If the renewed effort verifies the earlier measurements and construction details, Vaishya Tekri would add a major chapter to central India’s story of brick, earthwork, and early monumental masonry engineering.

Read the full, original article from Dainik Jagran MP CG here.

About: The Daily Digest
Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together