Brick Archway Entrance Guides Augusta University Summerville Campus Upgrades

Augusta University says a series of phased construction projects on its Summerville Campus will run through mid-2028, with the goal of improving how students and visitors move through the campus and how they use outdoor spaces. Current work is centered on pedestrian sidewalks and bus stop improvements, with scheduling intended to limit disruption to day-to-day campus life.

One of the most visible changes is planned at the campus entrance, marked by a traditional brick archway framing the Russell A. Blanchard Fountain. The university says a new bus stop is being built to blend traditional architecture with modern features, including a shaded waiting area with heaters and fans for students using the JagExpress Shuttle Service. Plans also call for outdoor lighting, digital signage, electric outlets, and an emergency call box. Construction is expected to continue into September, and the front roundabout is scheduled to be open by the first day of classes on Aug. 18 so the regular bus route can operate.

Sidewalks are also getting larger, more accessible paths designed to better connect key areas on campus. The university says the updated routes will accommodate larger groups walking together and allow for emergency vehicle access. An accessibility route is planned for the start of classes while work continues.

Additional projects include landscaping upgrades like a new sprinkler system, sod, outdoor lighting, and updated greenery. The university also lists several new or improved gathering spaces, including the Teardrop Rotunda, the Greek Life Plaza, tiered seating outside the Jaguar Student Activities Center, a shaded hammock zone, and a shaded area over the D. Douglas Barnard, Jr. Amphitheatre.

For mason contractors doing campus work, projects like this highlight a familiar balancing act: owners want upgrades that improve comfort, safety, and accessibility while still respecting signature elements like historic brick features and established architectural character.

Read the full, original article from Augusta University here.

About: The Daily Digest
Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together

PPE That Workers Actually Wear: Building Buy-In Through Education and Smart Selection
August 2026

In masonry construction, personal protective equipment (PPE) is often the last line of defense between a worker and an injury. Yet despite its importance, PPE compliance remains one of the most common challenges on jobsites across the country. The realit

Zero Laydown: Navigating the Logistics of Tight Urban Job Sites
August 2026

In modern commercial construction, spatial real estate has become just as valuable as the materials themselves. The industry shift toward high-density, urban projects means that the sprawling job sites of the past have been replaced by tight footprints wh