Design Review Keeps Brick Details Front And Center In Greenwich Village

When a neighborhood becomes a historic district, it is not just about protecting older buildings. In New York City’s Greenwich Village Historic District, the designation also triggers design review by the Landmarks Preservation Commission for new construction inside the district.

Village Preservation, which has tracked new building proposals in the district since its 1969 designation, argues that the review process gives the public a real chance to weigh in on what gets built. The group began publishing regular reports in 2017 and continues to update them, including its latest roundup, “New Buildings Approved for Construction within the Greenwich Village Historic District as of 2026.” Some approved projects never get built, but Village Preservation says the review process still shapes outcomes by putting designs under a microscope before work starts.

Two recent examples show how brick masonry details can become part of that conversation. At 534 Hudson St., a six-story mixed-use building designed by Kossar and Gary Architects and completed in 1999, the design leans on traditional cues, including punched openings and a tripartite composition with a clear base, middle, and top. A newer project, 44 W. 8th St., approved in 2024 and now under construction, was designed by INWORKSHOP architecture as a five-story and penthouse mixed-use building with punched openings and a brick corbeled cornice.

For mason contractors, this kind of review raises the stakes on details that crews build every day. Read the drawings for wall plane changes, soldier courses, corbeling, and transitions at window and door openings. Plan labor and sequencing around these features, and keep communication tight with the architect so field conditions do not undermine the approved look.

Village Preservation contrasts those projects with nearby sites just outside the district, where it says a lack of design review has contributed to buildings that clash with their context. It points to an approximately 538-foot-tall tower under construction at 5 W. 13th St. and a planned mixed-use project at 388 Hudson St. that envisions a tower up to 400 feet tall on city-owned land, with housing and a Parks Department recreation center at its base.

Read the full, original article from Village Preservation here.

About: The Daily Digest
The Science of a Straight Line: Why Masonry’s Smallest Decisions Make the Biggest Differences
September 2026

There is a unique phenomenon in construction: the human eye can spot an out-of-plumb wall from 50 yards away across a crowded job site. We might not always be able to explain the exact mathematical deviation without a laser level, but our brains instantly

The Utah Masonry Council's Masonry Education Day
September 2026

The 2026 Masonry Education Day at Interstate Brick in West Jordan is bringing together members of Utah’s architecture, engineering, and construction community for a day focused on education, technical understanding, and workforce development. The event r

MCAA Upstate New York: Regaining Market Share Through Education
September 2026

The Upstate New York chapter of the MCAA was established in 2014 by a dedicated group of both union and non-union masonry contractors, producers, and suppliers who shared concerns about the declining use of masonry. T

GEN NXT: Luis Sontay
September 2026

For this month, the MCAA got to sit down with aspiring mason Luis Sontay. From taking an interest in masonry as a kid to placing 1st in a postsecondary competition, Luis’ dedication and passion for the trade is clear. Luis describes his early passion fo