MCAA President and CEO Jeff Buczkiewicz To Testify To Congress On AI

Words: MCAA

On February 11, 2026, Jeff Buczkiewicz, President and CEO of the Mason Contractors Association of America (MCAA), will testify before the House Subcommittee on Workforce Protections. Representing a $41 billion industry, Buczkiewicz plans to showcase GEORGE, a purpose-built AI system developed over four years to enhance jobsite safety. His testimony highlights how technology can proactively monitor safety on the job site, including: monitoring PPE use, calculating complex wall bracing requirements, and assisting in historic restorations. By integrating AI, VR, and LiDAR, Buczkiewicz aims to protect workers, attract younger generations to the trades, and improve safety and productivity for the industry like never before.


About: Legislative
Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together