Case Study: TotalFlash in Action

Words: Michael Schmerbeck
/Public/News/20090709061500-1.jpg" width="300" height="200" border="0" alt="Asbury Tower before restoration.">
Asbury Tower before restoration.
Asbury Tower is a 26-story, affordable housing community for seniors. The 35-year-old facility has 347 apartments and is located on the ocean in Asbury Park, N.J. While the building was structurally sound, sections of the brick facade had begun falling off.

LAN Associates, Engineering, Planning, Architecture, Surveying Inc., based in Midland Park, N.J., has been retained to reengineer the skin and spec out the project. The project also includes mechanical upgrades to air conditioning and sprinkler systems as well as interior upgrades, including new kitchens and bathrooms.

The principal-in-charge and architect-of-record is Kenneth Karle, AIA, PE, and president of LAN Associates. LAN services federal, state, county and municipal governments; housing authorities; boards of education; Fortune 500 companies; foreign companies and private clients.

Blade Contracting, of Staten Island, N.Y., is the masonry contractor. The company specializes in brick, block and waterproofing of new construction, high rises, and restoration work.

After scaffolding the entire building, the brick on each floor is being removed and then replaced.

"The demolition was the real challenge," says James Lerie, VP of Blade Contracting. "On new construction, we start from the bottom and work our way up. This job's different. We're going from the top down, and it's a challenge. It's harder than other projects."

/Public/News/20090709061500-2.jpg" width="300" height="200" border="0" alt="Installation can be done quickly and methodically, and can even be done by one person.">
Installation can be done quickly and methodically, and can even be done by one person.
Faced with time constraints and a structure subjected to severe ocean weather, LAN specified Mortar Net's TotalFlash for cavity wall drainage. The pre-assembled panels of flexible flashing and drainage components are designed specifically to control moisture in masonry construction.

"We saw an ad for TotalFlash in a trade publication and requested information for this project," says Vlad Potiyevsky, project architect with LAN. "We didn't want to use copper or lead-coated copper, which must be soldered in the field. They're expensive and time consuming, and it's hard to get precise joints, especially working high up. Soldering lead-coated copper also puts off toxic fumes."

Since the architects, engineers and masons had never used TotalFlash, LAN chose to do mock-ups before the actual installation. This enabled them to iron out several issues, such as the height of the flashing, the installation procedure, and how to attach it.

LAN brought in a testing agency to test the system on the completed mock-up wall. A four-inch water column was put on the mock-up -- a lot of water -- and it held up flawlessly. The water wept through the embedded weep tabs, and everything worked well.

Potiyevsky says it was worth every penny to do the mock-ups and evaluate each step before starting the demo. Time spent in the beginning paid off.

"The mock-up allowed the contractor to get used to the system, rather than trying it for the first time on the building," Potiyevsky says. "Preplanning on the ground is much more effective than doing it, without practice, 26 stories up."

/Public/News/20090709061500-3.jpg" width="200" height="300" border="0" alt="Asbury Tower after restoration.">
Asbury Tower after restoration.
The structure has 500 linear feet of relieving angle per floor. During construction, a couple of other issues arose. The corners of the building have a five-foot, 45-degree splay. To accommodate the design, Mortar Net prefabricated the drip edges for the splays to eliminate cutting in the field. They also prefabricated the inside and outside corners.

Prefabricated pieces are much faster to install. Masons simply open the box, take out a panel, and then adhere and screw it into place, rather than handling and cutting rolls of flashing. Each five-foot, pre-assembled panel has everything built-in: termination bar, drainage matte for mortar droppings, edge dams, no-clog weep tabs, stainless steel drip edge and clearly marked lap-joints for precise coverage.

"TotalFlash is a great concept and the crew took to it in no time," says Lerie. "They're getting along with it quite well. There's a definite savings in time."

Installation can be done quickly and methodically, and can even be done by one person, resulting in significant labor savings. Plus, all components are built-in, so there's no downtime waiting for separate items to be delivered. Mortar Net reports that builders have seen labor savings of 50 percent or more, compared to conventional moisture-control detailing.

"I've been around a while, and this is a great product," Lerie ssays. "It's easy to work with, and it's a very good solution to the challenge we faced."

The project is ahead of schedule, and Potiyevsky attributes it to the masons and TotalFlash. "There was a slight learning curve on the first floor, but each successive floor is going smoother. The guys are really flying," he says. "This is a challenging project with demoing, relaying brick, starting from the top down, and it was a bear to scaffold. But everything's under control and figured out. We're getting the job done right, and ahead of schedule."
Is Contact with Wet Mortar or Grout Dangerous?
April 2026

In the world of masonry, few materials are as common as mortar and grout. Whether you are laying brick, concrete masonry units (CMU), or pouring grout into masonry walls, wet cement and mortar are constant companions. However, beneath their utility lies a

The Importance of Instructor Support
April 2026

Whether you are a new or veteran masonry instructor, we all need support throughout our careers. We can never stop learning, and keeping up with ever-changing technology, materials, and installation techniques can be overwhelming alongside the everyday pr

Vibing Masonry #11: Innovative Concrete Masonry Technologies in Healthcare Design
April 2026

In the high-stakes environment of healthcare design, every material choice is a clinical decision. Architects, engineers, and facility administrators are tasked with creating spaces that are not only resilient and code-compliant but also conducive to heal

Why Termination Bars Still Matter: A Practical Look at Long‑Term Flashing Performance
April 2026

In recent discussions across the masonry industry, I have heard termination bars described as “old school.” The implication is that with modern materials, primerless peel-and-stick flashings, advanced sealants, and structural insulated sheathing, mechanic