Using Hoists Instead of Cranes

Words: Dan Kamys
/Public/News/20070713082300-1.jpg" width="200" height="300" border="0" alt="Despite the benefits of cranes, they're not always the best machine for the job, or available on every job site.">
Despite the benefits of cranes, they're not always the best machine for the job, or available on every job site.

Despite the benefits of cranes, they're not always the best machine for the job, or available on every job site. Sometimes, a hoist can serve the same purpose, saving mason contractors money. A hoist continuously lifts materials to the workers as they lay brick, block or stone. It makes the scaffolding system self-sufficient, virtually eliminating the need for a crane.

"A hoist serves the mason by keeping the materials moving throughout the day, and you don't have the expense of the crane and operator," said Tami Hamilton, vice president of marketing for Beta Max Inc. in Melbourne, Fla. "The biggest selling points hoists have over cranes are really the expense and the dedicated time to use them."

Some scaffolding can't support the additional weight of large placements of masonry materials, which defeats the purpose of having a crane set them next to the workers.

"If masons are working on frame scaffolding, it may not be able to have heavy pallets of brick set on the work space," Hamilton said.

Even when heavy-duty mast climbers are used that can support the extra weight, cranes are not necessarily needed. A hoist can be easily mounted to the scaffolding to provide a continuous supply of materials.

"When bricklayers are working, the hoist keeps feeding the platform," said Jean Sebastien, technical services and project manager for Fraco Products Ltd. in St-Mathias-sur-Richelieu, Quebec, Canada. "All the bricklayers keep working so production is never stopped."

Last fall, Fraco introduced its new hydraulic, portable hoist, the FRH-4000, which the company technically calls a crane. It can comfortably handle 4,000 pounds of capacity, carry loads at 70 feet per minute, and lift them up to 330 feet. The hoist has 180-degree pivot capabilities that allow safe positioning of materials on both sides of a mast climber. The boom is higher than previous models, so the hoist will lift the load over the work platform's guardrails.

The hoist attaches to the mast climber's frame platform with four bolts in about 15 minutes. Instead of having an independent engine, the hoist shares the mast climber's power pack, using power on-demand.

"It is using the same power as the machine. It quickly connects to the mast climber and uses the same hydraulic fluid," Sebastien said. "It's not another power cost."

Beta Max's Gemini Plus portable hoist mounts to scaffolding or I-beams and has a non-rotating cable to keep loads from spinning. A single line can lift 600 pounds at 80 feet per minute up to 220 feet. A double line can lift twice that weight at 40 feet per minute up to 110 feet.

"You're moving smaller amounts of materials, but you're moving them throughout the day," Hamilton said.

The company's Maxial Track Hoist system is designed to lift loads in confined spaces. It works with frame or systems scaffolding, lifting up to 450 pounds at 80 feet per minute to a height of 350 feet.

Hamilton points out that masons can recoup the cost of a hoist — costing approximately $5,000 — on a single, large job by eliminating or significantly reducing crane time.

Using Respirators for Silica Exposure
July 2025

Some in the masonry industry have expressed interest in respirator use as protection from harmful exposure to silica. This topic is of paramount importance due to its impact on our workers and the serious health effects of silica exposure. For those new t

From Bikes to Buildings: The Importance of Embracing Rainscreen Wall Designs and the New Building Codes.
July 2025

Have you ever been asked to do a project over the course of your lifetime? For example, when my kids were little, my wife asked me to assemble their bicycles. So, I opened the box, dumped out the contents, and cast aside whatever I thought was unnecessary

Laying the Foundation for Growth: Concrete Masonry Checkoff Unveils Five-Year Vision for Industry
July 2025

The Concrete Masonry Checkoff (CMC) put the finishing touches on an ambitious five-year vision for the industry, targeting a 20% increase in market share, driven by increased demand for concrete masonry products. “This is about building exquisite, enduri

Five of the Seven Chimneys Have Been Saved: Project Chimney Update
July 2025

In the wake of the devastating January wildfires that swept through Los Angeles's Pacific Palisades, a remarkable preservation effort is underway, spearheaded by Project Chimney, an initiative led by Evan Hall, founding director of the non-profit House Mu