A New Future

Words: Milton Young
/Public/News/20060509134700-1.jpg" width="300" height="200" border="0" alt="Milton H. Young performed the work on the new indentification marker for Greene County High School.">
Milton H. Young performed the work on the new indentification marker for Greene County High School.

Greene County High School in Eutaw, Alabama, recently replaced its old marker with this new brick design for identification.

Through the efforts of Mrs. Carolyn M. Young, principal; Dr. Douglas L, Ragland, superintendent of schools; board members; faculty and student body, this new design with a tiger, the school's mascot, mounted on the top has fostered a deeper sense of pride and promoted greater community awareness for the school academic and athletic programs. The school is located just 1.8 miles east on U. S. Highway 14 at Exit 40 of - 120/59.

The new design is constructed with a reinforced concrete foundation 6" thick. Approximately 3,300 bricks were laid with 140, 12" blocks used as fillers. Overall dimension are: 14'-6" length; 9'-4" height; 1'-8 1/2" width.

Milton H. Young, retired masonry instructor, performed the work and continues to perform special jobs at the school. He holds professional membership in the Mason Contractors Association of America (MCAA); National Masonry Instructors Association (NMIA); and the Alabama Masonry Instructors Association (AMIA) and certified (commercial/residential).

Young and other members of NMIA also served as judges for the International Masonry Skills Challenge at the Masonry Showcase held in Las Vegas, Nevada on March 29-31, 2006.

For more information on the National Masonry Instructors Association, please visit www.masonryinstructors.com.

From Bikes to Buildings: Part 2
September 2025

As rainscreen wall designs become increasingly prevalent in today’s construction environment, there have been questions regarding their design. How wide should the capillary break be? How do we create this capillary break? Can the same methods be used i

Vibing Masonry #8: CMU’s Durability and Maintenance Value
September 2025

Heading to Spokane, WA, I found myself riding the airport tram at O’Hare in Chicago. Looking out the window at a part of the 26-year-old International Terminal 5, I spotted a painted structural steel beam in front of a concrete masonry unit (CMU) wall. Th

Keeping it Clean: Lifecycle Maintenance for Manufactured Stone Veneer
September 2025

One of the many benefits of manufactured stone veneer is that it’s a robust, durable product that requires little maintenance over the course of its life span. In fact, its irregularity in shape and color helps hide minor dirt and dust. But like any build

MCAA's Wall Evaluator: The Future of Masonry Training and Assessment
September 2025

MCAA Wall Evaluator, Masonry Training, Masonry Assessment, 3D Scanner, AR Glasses, Digital Twin, Digital Mesh, Point Cloud, Infrared VCSEL, Vocational Technology, EdTech, Standardized Assessment, Objective Evaluation, Data-Driven Feedback, Portable Traini