A Victory for Masonry

Words: Brooke SchmidtFor mason contractors around the country, it's a harsh reality that masonry often loses out to other building materials when decision-makers focus on short-term costs alone. But masonry's higher initial cost is justified by its versatility, durability, ease of maintenance and good looks. Masonry simply stands the test of time better than other building materials. Those who know best recognize: In a battle of brawn, brick, block and stone win every time.

Take Rob Greer's recent experience that is a true "victory for masonry." A past Mason Contractors Association of America regional vice president, Greer has provided estimating services for L.F. Jennings (LFJ), a masonry business turned general contractor in Falls Church, Va., since 1992.

When a Chantilly, Va., business owner contacted LFJ to build a 60,000-square-foot, single-story research and development flex building, suitable for office work, light manufacturing and warehousing, LFJ offered three budget options.

Greer explains that option one was a tilt wall priced at $35 per square foot. Meanwhile, option two was a split-face CMU wall system, priced just "slightly more than the tilt wall." Option three was a complete masonry system ? a load-bearing, insulated block wall with a two-inch cavity and brick veneer ? at approximately $40 per square foot.

As the general contractor on the job, Greer says, the process from this point was for LFJ to offer the facts to the owner. The ultimate decision was his.

"At first," Greer admits, "[the owner] was leaning toward tilt wall because of the lower initial cost, but he decided he would rather have brick and block construction because of the inherent quality."

By choosing the brick and CMU combination, Greer explains, the owner "knows there will be zero maintenance to the face brick. This owner also believes that it is easier to lease a brick building. He can justify the higher initial cost because his long-term return will be higher."

Additionally, because it is made of a complete masonry wall system, the building can easily accommodate new clients "without compromising the integrity of the exterior skin," Greer says.

"The owner was wise to choose face brick," he continues. "The brick will not lose its natural beauty over time, nor will [the owner] have paint peeling from the skin as he would with tilt wall. Life cycle costs are very important to this owner."

Although the owner chose the brick option, Greer says that, in LFJ's 53 years in the business, "Tilt wall has taken more business from the masonry industry than we have from them. The idea that tilt wall is faster than block is not always true. It's hard to prove to some developers. The developers of today want their buildings open as quickly as possible with the lowest initial cost. This is understandable, especially if the building will be sold soon after completion as real estate prices keep rising."

When it comes to construction, Greer continues, "Life cycle costs need to be taken into consideration when anyone is thinking of building a house, office building or warehouse. Brick and block have value because of their beauty and longevity. An owner should always consider this when selecting their materials."

"When an owner decides not to use a cheaper wall system because he sees the long-term life cycle value over today's cost," says Greer, "that is a victory for masonry."

Masonry in the Media: Casa Azul, Chapultepec Castle, & More
June 2026

A film’s settings can take viewers to new locations, all from the comfort of their own home. It immerses them in the scenes, whether they take place in an opera house in Brazil or a grand mansion in Mexico City. Explore how these Latin American masonry ma

Chairman’s Message: When Things Don’t Go as Planned
June 2026

Not every day in this business goes the way we planned. Some days, everything lines up. The crew is moving well. Materials are on time. The job is flowing the way you hoped it would. And then there are the other days. The ones where something breaks. T

Marvelous Masonry: Borobudur
June 2026

For masonry contractors and suppliers, few structures offer as much practical insight as Borobudur. Built in the 9th century in Central Java, this massive stone monument remains as one of the most advanced examples of large-scale masonry construction ever

Wrapping Up Our Year And A Look Ahead
June 2026

It is amazing another year has gone by and what a year it has been. We have seen a lot of progress on so many fronts. All of this happens specifically due to the support of our members. Your support this past year is positioning our industry to make huge