Use Simple Forms to Increase Information

Words: Paul AaronDocumentation is one of the most important tasks of project management. However, getting adequate, timely information from all of your field personnel can be difficult.

Whether you're using a simple paper system or a sophisticated electronic solution, try these practical tips to get more high-quality information from your employees.

Tip #1 - Simplify
Simplify paper reporting forms and data entry screens. Make them free of unnecessary instructions and information. Clutter is a fast track to disaster. Look at it from the worker's perspective. Most have a built-in resistance to paper work, launching mental and psychological defenses at the very thought of it. The first glance must be inviting and simple.

Example: Make instructions on the form simple. For those contractors using paper forms, consider creating a detailed, "filled out" sample version with more instructions. Laminate and distribute to each of your field personnel. For contractors using software, many have features to create descriptive notes that appear as the cursor hovers over data entry fields.

Tip #2 - Consolidate
Consider consolidating several forms into one or try using both sides of the page. How about a larger paper format like 8-1/2 x 14 or even 11 x 17 folded? (Copying is still easy because the folded size is still 8-1/2 x 11.)

Example: I once consolidated the daily report, a trench safety form and a traffic control checklist ? a total of three 8-1/2 x 11 forms ? into one 8-1/2 x 14 form without sacrificing simplicity or adding clutter. Then I added an extra work form and a daily schedule into the same form by using the opposite side. With this change, my personnel handle just one sheet of dreaded paper instead of five, and my office staff is delighted as well.

Tip #3 - Employee-friendly Forms
Your employees should never equate paperwork with writing workers' names and classifications, or all the equipment and routinely delivered supplies and materials. Once they've completed that portion of the report, they're finished. We then want them to focus on the more important project-specific, issue-related documentation.

Check daily forms for slots to record delays, disruptions and inefficiencies. Consider using tables on which to record information, with less "text" areas. Add columns to simplify and clarify options, where each column in a table is an option. Include repetitive product information on report forms. In the end, what you'll have is a partially filled-out report so your field personnel aren't discouraged. Make liberal use of check boxes for paper forms and pull down menus for electronic solutions. It makes it easy for workers to simply choose from a list of "approved" options.

Tip #4 - Train Every Day
On a daily basis, train your personnel to recognize issues and to report relevant information in the proper places as it happens. Don't hesitate to walk through an entire issue with them demonstrating how incomplete or unclear information loses credibility under the scrutiny of the change order or claims process.

The most important thing? Never give up!

Westlake Royal Building Products™ Expands Distribution Partnership with Lumberman’s Wholesale Inc.
September 2025

Westlake Royal Building Products™, one of North America’s largest manufacturers and distributors of exterior and interior building products, today announced an expanded distribution partnership with Lumberman’s Wholesale Inc. (LWI), a wholesale building

Business Building: What Are You Doing To Develop Future Leaders?
September 2025

When I ask my coaching clients if they have anyone in their construction company who could potentially move up from field superintendent to estimator or project manager, the typical answer is “No!” The same answer is usually given when asked if they have

Building More: Smoke Signals or Fire Extinguishers
September 2025

Ever watch a hot-potato game break out on your jobsite? It usually starts small. Somebody spots a crooked door frame, mutters, “I’ll make a note,” and flicks the issue to the next trade like it’s radioactive. By the time that frame comes back around, dryw

MASONRY STRONG Podcast, Episode 27 Recap: Rob McKay, Chief Operating Officer at Instone
September 2025

On this episode of the MASONRY STRONG Podcast, Rob McKay from Instone joins the show to talk about his story as well as the processes and procedures of manufacturing natural stone. Getting Started in Masonry: Rob’s Story Rob entered the masonry field by