Stone Mortar Mixer Line Receives Canadian Patent

Words: David Halsted
/Public/News/20100619080000-1.jpg" width="530" height="298" border="0" alt="The Stone Champion™ line of Mortar Mixers has received a Canadian patent for the removable seal and bearing housing.">
The Stone Champion™ line of Mortar Mixers has received a Canadian patent for the removable seal and bearing housing.

Stone Construction Equipment, Inc. has received a patent from the Canadian Patent Authority for the removable seal and bearing housing on the Stone Champion™ line of Mortar Mixers. The housing attaches with three bolts and contains Stone’s patented quadruple seal and bearing configuration. The removable housing makes servicing much easier and quicker, thereby reducing downtime and maximizing uptime.

The patent includes the housing, which facilitates servicing of the seals and bearing; an opening in the housing which allows contamination to drop out before reaching the bearing; the unique built-in puller flange for easy removal of the bearing; and the method of attaching the housing to the end walls of the mixer.

The removable housing is standard on all sizes of both steel and poly drum Stone Mortar Mixers from 4 cu. ft. to 16 cu. ft., and is included on the HM1290 Hydraulic Mixer, the full line of Silo Mixers and the full line of Buddy by Stone™ Mixers. The removable housing provides quick and easy servicing or replacement of the seals or the bearing without requiring the paddle shaft to be cut.

The removable housing had already received a U.S patent. The housing is only one of numerous Canadian and U.S. patents held by Stone for its Concrete, Mortar and Silo Mixer lines.
Chairman’s Message: When Things Don’t Go as Planned
June 2026

Not every day in this business goes the way we planned. Some days, everything lines up. The crew is moving well. Materials are on time. The job is flowing the way you hoped it would. And then there are the other days. The ones where something breaks. T

Fechino Files: Trust Your Subs, Just Document!
June 2026

When I was working for a large masonry contractor, we typically performed masonry work with our own employees. When we would construct large Segmental Retaining Walls, often we would require a subcontractor who had larger equipment for different portions

Marvelous Masonry: Borobudur
June 2026

For masonry contractors and suppliers, few structures offer as much practical insight as Borobudur. Built in the 9th century in Central Java, this massive stone monument remains as one of the most advanced examples of large-scale masonry construction ever

Wrapping Up Our Year And A Look Ahead
June 2026

It is amazing another year has gone by and what a year it has been. We have seen a lot of progress on so many fronts. All of this happens specifically due to the support of our members. Your support this past year is positioning our industry to make huge