Alert: OSHA's National Emphasis Program On Indoor + Outdoor Heat

Words: Jeff Buczkiewicz

OSHA has released a new National Emphasis Program (NEP) on outdoor and indoor heat. The program went into effect on April 8 of this year and will remain in effect for three years. 

Please see below for additional resources on heat safety: 

OSHA Heat Illness Prevention Campaign: https://www.osha.gov/heat
Heat Illness Prevention Video: 
https://www.youtube.com/watch?v=ipWmbc0d_Lc
Prevent Heat Illness At Work Poster: https://www.osha.gov/sites/default/files/publications/3431_wksiteposter_en.pdf
Sun Safety At Work Infographic: https://www.osha.gov/sites/default/files/Graphics_Heat_SunSafetyAtWork.zip
Heat Related Illness And First Aid: https://www.osha.gov/heat-exposure/illness-first-aid
Heat Illness Medical Emergency Infographic: https://www.osha.gov/sites/default/files/Heat_Illness_Medical_Emergency_English_Infographic.zip

For details on the NEP please click the links below:

NEP PDF: https://www.osha.gov/sites/default/files/enforcement/directives/CPL_03-00-024.pdf

NEP Fact Sheet: https://www.osha.gov/sites/default/files/heat-nep-factsheet-en.pdf

Heat Illness Prevention Campaign: https://www.osha.gov/heat

Installation Starts Before the First Course
August 2026

Some of the most expensive masonry installation problems begin long before crews arrive onsite. By the time a project reaches the field, many coordination decisions have already been made. Dimensional conflicts, congested reinforcement, specialty materia

Designing for Performance: Key Considerations for Efficient, Durable Masonry Projects
August 2026

A successful masonry project starts well before the first stone is set. The craftsmanship on site matters, of course, but many of the decisions that shape the final result are made much earlier—during design, detailing, and material selection. Those choic

Change Orders: Standard Operating Procedure
August 2026

In masonry construction, change orders are not occasional events; they are guaranteed. Drawings do not always match field conditions, specifications can conflict, and real-world construction has a way of exposing gaps in design. At DRP Masonry, we operat

RFIs: Clarity, Communication and... Hierarchy?
August 2026

In construction, any project starts with drawings. Plans. Schedules. Specifications. Whether we're talking about new construction, additions, or restoration, there is a plan, there is design intent, and a way every piece of a project needs to fit together