Air Barriers: Subcontract Barrier Installation or Keep In-House?

Words: Jeremy DouglasQ. I see a lot of masonry contractors installing fluid-applied air barrier systems. I have a couple of projects coming up where we were going to subcontract the barrier installation, but I think I’d like to see us move toward keeping that in-house. Do you have any advice to help us be successful?

A. Do I ever. You’re right, more contractors are performing the air barrier work themselves, and I think this is a really good thing. The air barrier systems will usually interface with the flashing materials and veneer anchors, so I firmly believe the mason contractor should have as much control over that interface as he/she is comfortable with. Also, on CMU backup projects, you have the ultimate control over surface preparation for the barrier system, which is so critical to the successful application of a fluid-applied system.

My advice is as follows:
  1. Understand what you are trying to achieve. A fluid-applied system is meant to be completely continuous across the entirety of the building at a specified thickness. This means the integrity of the backup wall must be solid, any holes or gaps must be filled or covered prior to application, and there must be no gaps or voids in your coverage of the substrate or where you wind up connecting to the roofing or below-grade waterproofing system.

  2. Rent the sprayer. Buy the sprayer if you like, but until you find one that works best for your company relative to size, output and cost, you can test drive spray equipment from your local supply yard or rental house. But whatever you do, use the spray equipment. Rolling the fluid-applied systems will usually lead to applications of less than the required dry-thickness, and ultimately a loss of continuity — not to mention the fact that you will be on site three or four times longer than if you were spraying.

  3. Most manufacturers have certification classes for application of their fluid-applied systems. Be sure to take at least one. In some cases, it will be required on certain projects; but more importantly, the information you will gain will reinforce your ability to deliver a solid product.

  4. If you have the option, use fluid-applied transitional materials. Some air barrier systems have both traditional self-adhering tapes and fluid-applied transitions that you will apply with a caulking gun and a trowel. Provided it is self-supporting, a fluid-applied transition will be much faster to apply, adhere better to the substrate, and achieve continuity better than the self-adhered tapes.

  5. Be sure of what will be required of you at the terminations/transitions of the fluid-applied system. If the system is to terminate inside of a window opening, establish ahead of time how far into that opening you are required to go so you connect to the window unit as intended. It is unlikely you will connect the fluid-applied material directly to the roofing system or the below-grade waterproofing system, so plan out those transitions ahead of time and ensure that the transitions are without compatibility issues.

  6. Check penetrations for air leakage. Some barriers seal better than others, depending on their elasticity and dry-thickness. Any penetrations that are made to the barrier will need to be airtight, whether the air barrier acts as the sealing agent or you use a secondary tape, washer or other sealant to accomplish the same thing or to act as a redundancy.

  7. There will often be a third-party consultant who will advise on the air barrier installation throughout the process. It may sometimes seem as if they are being difficult or picky, but in the end they are trying to help you deliver the best installation possible. Try to work with them without taking their comments personally.

  8. Partner with your manufacturer. They are your best resource for technical information, troubleshooting, and problem solving and will be a necessary part of your process on every project.
While not every issue you may come across is addressed here, this is a short list of the issues some air barrier installers struggle through when learning what these systems are all about. I absolutely support you and other contractors who want to better control the quality of the installed components of your wall systems. Best of luck to you.
Using Respirators for Silica Exposure
July 2025

Some in the masonry industry have expressed interest in respirator use as protection from harmful exposure to silica. This topic is of paramount importance due to its impact on our workers and the serious health effects of silica exposure. For those new t

From Bikes to Buildings: The Importance of Embracing Rainscreen Wall Designs and the New Building Codes.
July 2025

Have you ever been asked to do a project over the course of your lifetime? For example, when my kids were little, my wife asked me to assemble their bicycles. So, I opened the box, dumped out the contents, and cast aside whatever I thought was unnecessary

Laying the Foundation for Growth: Concrete Masonry Checkoff Unveils Five-Year Vision for Industry
July 2025

The Concrete Masonry Checkoff (CMC) put the finishing touches on an ambitious five-year vision for the industry, targeting a 20% increase in market share, driven by increased demand for concrete masonry products. “This is about building exquisite, enduri

Five of the Seven Chimneys Have Been Saved: Project Chimney Update
July 2025

In the wake of the devastating January wildfires that swept through Los Angeles's Pacific Palisades, a remarkable preservation effort is underway, spearheaded by Project Chimney, an initiative led by Evan Hall, founding director of the non-profit House Mu