MITA alumni compete at Fastest Trowel

Words: Lyn OlesonWho laid the most block in the Fastest Trowel competition at Baselite Concrete Products in Dixon this year? It was former MITA student Howard Cole. He did 111 block in just 20 minutes! Yes one-hundred-eleven block. Not only did Howard start out as a MITA Apprentice, but masonry foreman Richie King started as a MITA student too. For real! Now they enjoy great careers in the industry, and support MITA trainees and apprentices with their leadership. We appreciate you MITA alumni!

At the Fastest Trowel at Dixon, journeymen put their speed and skill to the test against a 20-minute clock. They try to complete as much as possible of a 24‐foot long wall of standard, medium weight, 8”x 8”x 16” concrete masonry units. Each contestant (a journeyman with his favorite tender) uses the same weight block and the same mortar, supplied by Basalite. They can temper their mud with water or san190d.

They get a half hour or so before the clock starts to work their mortar, locate and set the height of the mortar boards, and finalize the locations of their block stacks. During this time period the contestant will also lay a 24‐foot base course and check the alignment (they don't count the block in the base course in the final total) but it must be all full size units. And the wall starts and end with half units, to have an actual finished length of 24 feet.

Howard laid the most to take 2nd place. But the judging also includes true and workmanship subjectively rated, and 1st place went to a multi-year winner Keith White of Stonelake Masonry.
Designed for the Way Contractors Work Today
September 2026

Every piece of equipment tells a story about the challenges contractors face. For more than 30 years, the EZG Manufacturing team has listened to those stories—through customer relationships, job site visits, dealer feedback, a

Chemicals In Masonry
September 2026

Mason contractors must deal with chemicals on the job site. One of the main ones comes in the form of dust. Another is acid. From high-rise commercial structures to residential facades, masonry work involves handling raw materials that require careful man

Brick Staining Dos and Don'ts: Managing Modern and Historic Masonry Construction
September 2026

Every mason contractor has encountered it, or will. A replacement brick arrives from a different production run. A cast stone repair patch or perhaps a darker panel stands out against the surrounding installation. Mortar color varies unexpectedly. A clea

Gables Republic Square & Hotel ZaZa
September 2026

Gables Republic Square / Hotel ZaZa is a 24-story mixed-use boutique hotel and urban residential tower with street-level retail located on a 0.75-acre site in downtown Austin. Camarata Masonry Systems, Ltd. (CMS) was responsible for the supply and instal