Tekla accelerates construction information with Tekla Structures 20 software for BIM

Words: Marylee AntonTekla, a global provider of Building Information Modeling (BIM) software to the engineering and construction markets, announced the availability of Tekla Structures 20. The newest version of Tekla’s industry-leading BIM software improves construction workflow efficiency by providing the means to better organize models, manage tasks and avoid structural clashes. In addition, the constructible models created with Tekla can incorporate more detailed information than ever before. The new version is available at www.teklastructures.com.

As BIM penetrates construction industry processes, architectural trends produce increasingly complex shapes, and buildings include more refined technology, information exchange becomes progressively more important. Tekla Structures 20 meets this requirement by expanding the capacity of constructible Tekla models to easily handle the large amounts of information needed to accurately reflect the detail contained in complex build structures.

New tools for better information management

Tekla Structures 20 brings even more detailed information and flexibility to modeling, while reducing the need for manual data transfer. Information now flows more efficiently from design, purchasing and production to the shop floor. Tekla also provides more links to architectural and design solutions to remove the technical and compatibility barriers that compromise workflow between project teams and subcontractors using different types of applications.

To ease the management of the massive amounts of constructible building information needed for contemporary structures, Tekla Structures 20 also offers several improved tools:
  • Organizer delivers more efficient model information management and increased automation.
  • Task Manager offers a systematic way to plan detailing, fabrication and erection on site.
  • Clash Check Manager allows communicating, assigning, coordinating and avoiding structural conflicts before they appear on site to help save money and time.
“Tekla Structures 20 contributes to the essential processes of today’s information-intensive construction industry,” said Risto Räty, Executive Vice President of Tekla and General Manager of Trimble Buildings’ Structures Division. “Ultimately, construction is about collaboration. When information is missing it is hard to work effectively with other construction team members to avoid preventable delays and cost overruns. Tekla Structures 20 dramatically improves project team communication and collaboration by providing the detail needed for building complex structures, offering process-improving tools, and effortlessly working with other software applications, thereby delivering on the promise of BIM for the construction industry.”
From Day One to Long-Term Success: Onboarding Strategies for Contractors
January 2026

The construction industry is facing one of its toughest challenges in decades. Companies are struggling to find enough skilled workers while competing to keep the ones they have. At the same time, projects are becoming more complex, deadlines are tighter,

Finding the Right PPE for Your Work
January 2026

When it comes to PPE, one thing’s for sure: safety isn’t one size fits all. The work you’re doing, where you’re doing it, and even what time of year it is, can all make a big difference in what gear actually works. Price, comfort, and job performance all

Back Injuries: The Real Cost and How to Prevent Them
January 2026

The mention of back injuries makes mason contractors cringe, and for good reason. Masons lift heavy objects every day, all day long. When a person sustains a back injury, it is serious. It affects every part of their life, from their ability to perform wo

Detailing for Durability: The 2026 Guide to High-Performance Stone Veneer Transitions
January 2026

Some of the most expensive failures involving manufactured stone veneer installations don’t come from the stone at all, but rather from the material transitions and flashing around it. Transitions are weak points in the overall cladding where water can fi