Grace Preprufe meets waterproofing challenge in Qatar

Words: Dan KamysAt the $5.5 billion Downtown Doha development in Qatar, Grace Construction Products’ Preprufe waterproofing membrane has been specified to provide a waterproofing solution.

Downtown Doha is said to be “the world’s first sustainable downtown regeneration project,” was and designed and built by Msheireb Properties, the country’s leading sustainable developer. The 76-acre development aims to blend traditional Qatari heritage with modern, sustainable technologies. Preprufe offered a waterproofing system that combines watertightness, low environmental impact and long-term performance with a fast, simple application in temperatures regularly topping 40 degrees Celsius.

Starting on site in 2010, about 300,000m2 of Preprufe 300R waterproofing membrane has been applied to prevent water penetration and migration around the development’s extensive substructures. With the final phases of construction set to commence in 2013, Grace will complete the application of more than 600,000m2 of Preprufe 300R to keep the landmark project watertight and on course for its 2016 completion date.

Designed with synthetic adhesive layers combined with a robust HDPE film, Preprufe provides a permanent physical barrier that will protect each structure against chloride and sulphate attack. Grace’s patented Advanced Bond Technology enables concrete to aggressively adhere to Preprufe, forming a unique intimate seal to prevent any water migration between the waterproofing and the structure, substantially reducing the risk of leaks.

The Preprufe system protects a substructure from the harmful effects of water, vapor and gas. It can be applied on wet substrates and is immediately trafficable after installation without protective layers, which makes for fast and easy application. When compared to traditional loose-laid PVC systems, Preprufe is more than five times quicker — with about 500m2 laid in one day, compared to 60 to 100m2 of PVC during the same time period.

To complete the comprehensive application, Grace supplied 100,000m2 of Bituthene 8000 HC waterproofing membrane to deliver complete structural protection against the water table and aggressive ground conditions.

When complete, the project will comprise more than 100 residential and commercial properties that reflect the culture and aspirations of the people of Qatar. Designed to generate less waste, deliver long-term cost savings and minimize its own carbon footprint, Msheireb Downtown Doha will become an iconic landmark in Qatar — while benefitting from the performance of the Preprufe waterproofing solution from Grace.

For more information, visit www.preprufe.com.
Is Contact with Wet Mortar or Grout Dangerous?
April 2026

In the world of masonry, few materials are as common as mortar and grout. Whether you are laying brick, concrete masonry units (CMU), or pouring grout into masonry walls, wet cement and mortar are constant companions. However, beneath their utility lies a

The Importance of Instructor Support
April 2026

Whether you are a new or veteran masonry instructor, we all need support throughout our careers. We can never stop learning, and keeping up with ever-changing technology, materials, and installation techniques can be overwhelming alongside the everyday pr

Vibing Masonry #11: Innovative Concrete Masonry Technologies in Healthcare Design
April 2026

In the high-stakes environment of healthcare design, every material choice is a clinical decision. Architects, engineers, and facility administrators are tasked with creating spaces that are not only resilient and code-compliant but also conducive to heal

Why Termination Bars Still Matter: A Practical Look at Long‑Term Flashing Performance
April 2026

In recent discussions across the masonry industry, I have heard termination bars described as “old school.” The implication is that with modern materials, primerless peel-and-stick flashings, advanced sealants, and structural insulated sheathing, mechanic