Masonry Magazine January 2014 Page. 34

Masonry Magazine January 2014 Page. 34

Masonry Magazine January 2014 Page. 34
AIR BARRIERS
requirements. Self-adhered mater ials must be have primers installed correctly, the material needs to be rolled into place with a pressure roller (to make it free of air pockets) and have sealants installed at the termination. When installing fluid-applied materials, the installer needs to ensure the material is being applied at the manufacturer's required thickness. Boardstock need to have the joints sealed to
11 ;th 1h
provide an air control layer, maintain the CM_U_Joi_,h_ m_,_sl_b�_ _"_h_w_ _ _�_��_ll_fa_" ___________
wate r control layer, and have the specified fasteners project, properly preparing the substrate and installing the installed at the spacing required by the manufacturer. material correctly, you can ensure that we build an energy-Designing a continuous air barrier assembly to be efficient building stock free of problems. lMAS
installed by an ABAA-Accredited Contractor using ABAA-Co/In Szewaga, C.E.T. , is technica/servicesadvisorforlheAir Certified Air Barrier BarrierAssociationofAmerica (ABAA). insta llers has been
recognized by the JAN. 20 -24, 2014
construction indus�
Visit ABAA at the World of Concrete, Jan. 20 -24, 2014. in Las
try as providing a
Vegas, where we will be demonstrating proper installation of air bar�
-
top-quality air barr i�
rier assemblies at "Air Barrier Live -Presented by ABAA~ in the
assembly. By
North Hall. You can view our installer trainees installing air barrier designi ng the air bar�materials in the ABAA training area in the Gold Lot, front of North rier assembly so that Hall on Jan. 23, 2014. Air barrier installers also can register in the
ABAA fluid-applied and self-adhered training course. To sign up for our training course or for more information, email abaa@airbarri�er.org, visit www.airbarrier.org or call 866-956-5888.
Block
Mortar EZClip Plate
EZClip Mortar
Block

ADVANTAGES
�EAIIIHTALI
Justmortarandslideonclip.


IILI AIIINIII Positions weld p~te flush wlblock front automatical~.


IILI AIJIIJINI Flexible to fit most standard block wall thickness.


IllIf TIE WAY Frts flush to wall, will not snag clothes or equipment



IIMIVAIII nm Just cut wrrh trowel or chisel edge.


INIXPINIIVI Low cost per clip, no adhesive or wires to buy or lose.


Ph: 80t.l92.8l77'888.922.8377 � Fx: 80t.l92.8l78 �tncomaS32 MASONRY � January 2014 � www.masoncontractors.org The Voice of the Masonry Industry