How to get the roof on before the masonry is complete!


Hempstead Bank

(Continued from page 7)

HEMPSTEAD BANK

E. W. Howell Co., of Babylon, N.Y., and masonry craftsmen of BM&PIU Local 30-Ν.Υ.

In addition to its soundproof, fireproof, and relatively maintenance-free qualities, the aesthetically-pleasing results of a superior design are especially pleasing to the owners and to the architectural firm. A series of arches along with curved steps, planters, and balconies, as well as masonry paving, all with brick of varying tones, give an everchanging view as one moves through the interior.


Adjustable Econo-lok® makes it possible!

Closing up the building weeks ahead of schedule or ahead of the weather can save thousands of dollars by letting interior trade proceed while masons are still working. It's done like this. The concrete block back-up wall is rapidly constructed using the AA Adjustable Econo-Lok System. After the building shell is completed and roofed, the masons can apply the facing at any time using the Adjustable Econo-Lok loops. Joints do not have to line up. Both walls are locked together securely, yet with ample flexibility for normal building movement. It's fast and sure. This is but one of the many quality AA products shown in the new Masonry Reinforcing Guide. Send for yours. AA Wire Products Company, 6100 South New England Avenue, Chicago, Illinois 60638. Manufactured in Chicago, Dallas, and Toronto, Canada.

25th anniversary of service and quality


AA WIRE PRODUCTS COMPANY

8 masonry October, 1972