Amerimix
EZ Scaffold Corp.
EZG Manufacturing
Hydro Mobile, Inc.
Loot
Non-Stop Scaffolding
PROSOCO, Inc.
SOLA/Keson
SPEC MIX LLC
Stabila
Westlake Royal Stone Solutions
Find-a-Contractor Masonry Buyer's Guide

INDOT Review of Testing Procedures and Approval Process for SRWs.

Provider: Ohio Masonry Association
Discipline: General
Credits: 1.00

Tony Zander, Concrete Engineer for INDOT Office of Materials Management, will discuss with us the INDOT Recurring Special Provision requirements and standard procedures for acquiring approval for SRWs to be used on INDOT Contracts involving concrete modular block retaining walls. There are two types of approval processes; one would be a pretested quantity of product manufactured at the plant and identified as such so the product can be shipped, with final verification by the project personnel prior to use. In mid 2009 INDOT prepared a Construction Memorandum, which clarified the verification procedure to be used by INDOT project personnel. The second is a job site sampling and testing of units delivered to the job site.

For more information please visit www.ohiomasonry.org or contact Ohio Masonry Association at 800-443-6779.

Future Dates and Locations

Link Date Time Location Speaker Cost
No courses scheduled

“Joining the MCAA will pay off instantly as all their tools will be available to you.”

Paul Cantarella
Cantarella & Son, Inc.
MCAA member since 2013

Learn More